Your turnkey website, in 48 hours.Get started
← Back to Construction & renovation
Construction & renovationBricklayer

Long jobs that fill the diary months ahead.

A wall, a slab, an extension: your jobs run for weeks and are decided months beforehand. The problem is not filling tomorrow, it is not having a gap in September.

4 min readServices and durations set up with youLive within 48 hours
In short

Enquiries qualified before the visit — area, access, timescale —, quoting visits grouped together, a quote signed online with a deposit, stage payments, and a diary you can see weeks ahead.

Typical serviceDurationDeposit
Quotation visit — extension1 hrfree
Quotation visit — wall or fence30 minfree
Concrete slab (per day)full day30% of the quote
Opening up a load-bearing wall2 days30% of the quote
Crack repairhalf-day€150
An example setup. Your durations and your amounts are your own, agreed when we install it.
01

The diary fills by the week

A bricklayer does not sell hour-long appointments: he sells weeks on site. What costs money is not an empty slot, it is a dead week between two jobs because a quote was not signed in time.

Traxo thinks in blocks: days and weeks booked out, jobs set months ahead, quoting visits grouped at the end of the day so they do not break up a morning of shuttering. You can see two months of work ahead, not two days.

  • Jobs blocked out in whole days or whole weeks
  • Quoting visits grouped into one dedicated window
  • A view of the next eight weeks' workload
02

Enquiries sorted before you go

Driving out to price a job is half a day gone when the project is not ready or the budget is nowhere near. And while you are driving, the phone rings unanswered.

The online enquiry asks the questions that sort them: area, access for the machine, planning permission, expected timescale, rough budget. The serious projects arrive with their photos; the rest never get as far as booking.

Common mistake

Taking every quoting visit so as not to miss anything. At three visits a week with no deposit at the end of them, that is a day of production lost every week.

03

Signed, then paid by stages

On a long job, cash flow is all about deposits. Traxo builds the quote from your usual line items, has it signed online, and takes the deposit that holds the period in your schedule.

After that, the stage invoices go out at the points you have set — foundations, walls, finishing — with an automatic chaser if one runs late. You are no longer funding your customers' materials.

  • A 30% deposit taken on signing
  • Stage invoices at each phase of the job
  • Automatic chasers on overdue invoices
04

Finished jobs sell the next one

Nobody hands over an extension because the quote was cheaper: they hand it to the person whose work they have seen. Your before-and-after photos, sorted by type of job and by town, are worth more than any sales pitch.

When the job is handed over, the review request goes out with the link to your Google listing. A bricklayer with twenty detailed reviews and photos of his work no longer has to bid on price.

“I can see my diary through to October. It is the first time I have been able to turn a job down without wondering whether there would be work after it.”

Illustrative example · bricklayer, 3 men, Ille-et-Vilaine

Common questions

You can show no prices at all, or nothing more than a “from” figure. The sorting then happens through the enquiry questions: area, access, timescale, rough budget.

Other trades in Construction & renovation

Let's talk about your trade, not software

We'll show you what it looks like with your own services, durations and prices. You decide afterwards.

Build my website

Or call us on +33 6 95 27 56 72, Monday to Saturday